Book a demoWhatsApp
FBR digital invoicing · Multan · Lahore · All Pakistan +92 300 486 8021+92 310 633 4081info@meezanerpsolutions.com
🏭 Industries

Manufacturing ERP

Sales order to dispatch — every batch planned, issued, produced, checked and costed

Built for
Plastic packaging (blow & injection moulding)Engineering & fabrication worksAuto parts vendorsElectrical goods & cablesSteel products & fastenersChemicals & paintsHousehold & kitchenwareFurniture & fixturesRubber & foam products
▶ Live demo — Manufacturing

Meezan ERP set up for a sample manufacturing business: its own documents, vouchers and WhatsApp automation. It plays by itself — click any screen to take over, or type your company name and press the button.

Logged in as owner
What the demo shows — 10 screens
  1. Plant dashboardOutput, machine efficiency, rejects, orders due and money position — on one screen and on the owner's WhatsApp twice a day.
  2. Bill of materialsThe standard recipe for one product — material per piece, rates and conversion cost give the standard cost.
  3. Material issue noteThe store issues against the work order — anything above the BOM quantity is flagged before it leaves.
  4. Shift productionShift A from the moulding hall: target, good pieces, rejects and efficiency for every machine.
  5. QC inspectionEvery batch tested before it can move to the finished goods store — failed tests put it on hold.
  6. Sales tax invoiceDispatch on one document: delivery challan, gate pass number and the FBR sales tax invoice.
  7. Cost sheet — std vs actualThe work order closes with its actual cost per unit beside the standard — every rupee of variance has a reason.
  8. Receipt voucherThe customer's payment is received against the invoice — income tax withheld is booked as an adjustable credit.
  9. WhatsApp — ownerThe owner approves the resin purchase and gets the night report on WhatsApp — no login needed.
  10. WhatsApp — floor & buyersSupervisors report breakdowns from the floor, and customers get dispatch details without a phone call.

How Meezan ERP runs a manufacturing business

A plant makes money in the gap between the standard cost on paper and the actual cost on the floor: a few grams of extra resin per piece, a machine that runs at 70% for a week, a batch that fails QC and is reground. Meezan ERP links the sales order to the production plan, the bill of materials, the work order and every kilo issued from the store. Production is entered by shift and machine, QC releases the batch, and dispatch moves on a gate pass with a sales tax invoice. The owner sees standard against actual cost per unit for every work order, not an average at year end.

Usual weak points

  • Material issued in bulk, so nobody knows what each order really consumed
  • Machine output and rejects written on a board and lost by the next shift
  • Cost per unit is last year's estimate, not this batch's actual
  • Goods leave the gate without a gate pass matched to an invoice

How Meezan ERP covers them

  • Bill of materials per product with standard quantities, scrap allowance and conversion cost
  • Work orders that issue exactly the BOM quantity and flag every extra kilo
  • Shift-wise production per machine: good pieces, rejects, downtime and efficiency
  • Standard vs actual cost per unit for every work order, with the variance explained

The workflow, step by step

One system from the first document to the profit report — no re-typing between departments.

  1. 1Sales order

    Customer order with product, quantity, rate and delivery date; credit limit checked before it is accepted.

  2. 2Production plan & BOM

    Orders grouped into a weekly plan per machine; material need worked out from each product's BOM against stock.

  3. 3Work order & material issue

    Work order released to the floor; the store issues resin, masterbatch, caps and labels against it.

  4. 4Shift production

    Supervisor enters good pieces, rejects and downtime per machine and shift from the floor.

  5. 5QC & finished goods

    Batch tested for weight, wall thickness, drop and leak; released lots move to the finished goods store.

  6. 6Dispatch & costing

    Delivery challan, gate pass and sales tax invoice together; work order closed with actual cost per unit.

Modules used in manufacturing

Sales orders & planning

Orders, delivery dates, machine loading, material requirement and shortages.

BOM & work orders

Multi-level BOM, scrap allowance, routing, work order release and closing.

Store & material issue

GRN, issue against work order, returns, regrind and reorder levels.

Shift production & machines

Good pieces, rejects, downtime reasons, mould changes and efficiency per machine.

Quality control

Incoming, in-process and final inspection; batch release, hold and rejection.

Costing, dispatch & accounts

Gate passes, sales tax invoices, receivables, WHT, standard vs actual cost.

Included in every system

FBR-integrated invoicing · tax returns · WhatsApp approvals and reports · cloud or on your own server · built to your process

WhatsApp automation for manufacturing

The owner approves and gets reports on WhatsApp; staff, customers and suppliers send and receive their documents there — every message is posted in the ERP.

  • Output and efficiency per machine and shift
  • Material issued vs BOM per work order
  • Reject and regrind % per product and machine
  • Standard vs actual cost per unit, order by order
  • Orders due this week against stock and capacity
How WhatsApp automation works →
💬Meezan ERPonline
Production yesterday?
41,800 good pieces · 3.0% rejects. BM-04 ran at 67% (mould change). WO-0581 is 82% complete.
HDPE stock
18.4 tonnes = 6 days of the current plan. PO-0219 for 25 tonnes due Thursday. Remind supplier? 1 = Yes

Want to see it with your own data?

We set up a demo for your business and show it on a call or at your office in Multan or Lahore.